KNOWLEDGE BASE

Better data. Better decisions.

Practical instructions for the team: import, anomalies, costs, offline work, conflicts and reports.

How to prepare the import of measurements

CSV or XLSX file with meter ID, date with time zone offset, value, unit and interval.

  • One value per row and interval (e.g. 60 min, 1 day).
  • Meter multiplier applied by server - enter raw value.
  • Re-import of the same line will be recognized as a duplicate.
  • No measurement is a gap, not zero consumption.

How to investigate an anomaly

An alert is a signal to be checked, not a verdict.

  • Compare the period with the same week and the facility's schedule.
  • Check interval coverage and the meter reading.
  • Record your decision: confirm, reject or resolve - always with justification.
  • Create a task for the technician if necessary.

How to interpret energy cost

Cost is energy and distribution according to the tariff version in force at the time.

  • Fixed fees are distributed in proportion to the period.
  • You keep supplier invoices in a separate register for reconciliation.
  • Currencies are not mixed in totals.
  • VAT and non-tariff charges are described in the report.

Field reading without network

The Android application saves the reading and photo to the device's encrypted queue.

  • Sign in while online before starting field work.
  • Once the connection is restored, open History and select Sync.
  • Do not clear app data before confirming sync.
  • The queue is related to account, organisation and role.
  1. 01

    Registry and import

    Facility, building, zone and meter. CSV/XLSX import with unit, interval and duplicate control.

  2. 02

    Data validation

    Gaps, unrealistic values and cumulative readings are checked, and corrections record their author.

  3. 03

    Alert and analysis

    Rules create alert. The assistant compiles measurements, coverage and peak power as evidence.

  4. 04

    Team decision

    The manager confirms or rejects with justification, assigns the task and deadline.

  5. 05

    Report and cost

    Cost by tariff, budget, forecast and CO₂e estimate in PDF or XLSX report.

Reading conflict — an informed decision

When the server has a newer measurement, the application does not automatically overwrite it.

  • In History, select Compare and Resolve.
  • Check the current meter version and server measurement.
  • Enter a justification and confirm the correction or save the draft.
  • The correction receives a new key and is validated again.

ESG report step by step

CO₂e estimate from measurements and emission factor of known source.

  • Select the sites and reporting period.
  • Check data coverage and missing meters.
  • Download a PDF or XLSX report with its methodology.
  • The report does not replace an audit or certification.

NEXT STEP

See NexaEnergy with your data.

Presentation, import plan and quote for your portfolio.

Mobile app

Your energy. Always at hand.

Meter readings with photos, alerts and decisions, portfolio reports and documents — even without coverage, in the device’s encrypted queue.